If you own or are thinking of buying a listed building, one question comes up again and again: do I need listed building consent for this? The honest answer is that it depends on the building and on what you want to do, but the legal test is simpler than many people expect. This guide explains what needs consent in England, what often does not, how it differs from planning permission, and what happens if work goes ahead without it.
It focuses on England. Wales has its own legislation and guidance, so check the Welsh position if your building is there.
The legal test: does the work affect the building’s character?
Under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990, no one may demolish a listed building, or alter or extend it “in any manner which would affect its character as a building of special architectural or historic interest”, unless the works have been authorised. In practice, that authorisation is listed building consent.
Two points follow from that wording:
- Demolition of any part of a listed building needs consent. Government guidance says works to demolish any part of a listed building require consent.
- Alterations and extensions need consent where they would affect the building’s special interest. Whether a particular change crosses that line is a matter of judgement, and that judgement belongs to the local planning authority, not the owner.
The test is the same for every grade. Grade I, Grade II* and Grade II buildings are all protected by the same consent requirement, even though the most important buildings attract closer scrutiny.
Listing covers more than the front elevation
A common misunderstanding is that only the parts mentioned in the list entry are protected. Government planning guidance is clear that, for all grades, unless the list entry says otherwise, listing covers the entire building, inside and out. It may also cover objects or structures fixed to the building, and buildings or structures within its curtilage.
That means interior features such as staircases, fireplaces, panelling, cornices, doors and historic floor plans can all be part of what is protected. The list entry is a useful starting point for identifying significance, but it is not a complete inventory. A feature that is not mentioned is not automatically unprotected.
Curtilage structures, such as boundary walls, outbuildings or garden structures, can also be caught. Whether a structure is treated as part of the listed building depends on its history and relationship to the main building, so take advice before altering or removing one.
Works that often need listed building consent
Every case turns on the building, but the following types of work frequently need consent because they can affect historic fabric or character:
- Replacing windows or doors, particularly where the material, design or glazing changes
- Removing or moving internal walls, or changing the historic plan form
- Extensions, including rear and side extensions and conservatories
- Loft conversions, new rooflights and dormers
- Removing chimney stacks, chimney breasts or fireplaces
- Changing roof coverings, for example replacing slate or clay tiles with another material
- Rendering, painting or cleaning external masonry, and some repointing
- Installing new kitchens and bathrooms where this affects historic fabric or layout
- Adding satellite dishes, solar panels, flues, vents or external lighting
- Secondary glazing, insulation and other energy efficiency measures that alter historic fabric
These works do not always need consent, but they commonly raise the question, so check before you start.
Looking for experienced and professional planning consultants?
Fill in your details and we'll give you a call.
GET IN TOUCHWhat type of application or permission do you require?
Please enter the location details of the property.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Please enter the size of the project you require planning for.
Fill in your details below to get your instant quote.
Fill in your details below to get your instant estimate.
UKPC will pass your details to no more than 5 local partners
who will contact you to arrange a formal quotation.
Summary
| Description | Information | Quantity | Price |
|---|---|---|---|
| Discount : | |||
| Total : | |||
Works that may not need consent
Routine maintenance and genuine like-for-like repairs, using matching materials and methods, often do not affect a building’s character and so may not need consent. Examples can include clearing gutters, replacing a broken slate with a matching one, or repainting joinery in the existing colour.
The difficulty is that “like for like” is narrower than it sounds. Modern materials, a different mortar mix or a change of finish can mean the work is no longer a straight repair. Government guidance encourages owners to discuss the matter with the local planning authority if there is any doubt about whether consent is required.
Certificate of Lawfulness of Proposed Works
If you want formal confirmation that proposed works do not need consent, you can apply for a Certificate of Lawfulness of Proposed Works under section 26H of the 1990 Act. According to government guidance, these certificates cover alteration or extension (not demolition), are only available for works that have not yet been carried out, and the works must be undertaken within 10 years of the certificate being issued. There is no obligation to apply for one, but it can give useful certainty, particularly if you plan to sell the property later.
Listed building consent and planning permission are separate
Listed building consent and planning permission are two separate regimes. Some projects need both, some need only one and some need neither. Government guidance summarises the position as follows:
- You need planning permission if the work would usually need a planning application even if the building was not listed.
- You may not need planning permission if the work would normally be permitted development and those rights have not been restricted or removed. Permitted development rights can be more limited for listed buildings, so check carefully.
- Internal works generally do not count as “development”, so they usually do not need planning permission, but they may well still need listed building consent.
A typical rear extension to a listed house, for example, will often need both. An internal alteration such as removing a historic partition may need listed building consent but not planning permission.
How to apply
Applications are made to the local planning authority, usually online through the Planning Portal. Government guidance confirms that there is no fee for a listed building consent application, although a linked planning application will carry its normal fee. For a fuller breakdown of the other costs involved, see our guide on how much it costs to obtain listed building consent.
The application will normally need:
- Plans and drawings showing the existing building and the proposed works
- A heritage statement describing the significance of the building and how the proposals affect it. Government guidance expects applicants to describe the significance of any heritage assets affected, including the contribution made by their setting
- Details of materials, methods and, where relevant, specialist reports such as structural or joinery assessments
Pre-application advice from the council’s conservation officer is often worthwhile for anything beyond minor works. Some councils charge for this service. Decisions can be refused, granted or granted with conditions, and there is a right of appeal against a refusal.
What happens if you carry out works without consent?
Carrying out works that need listed building consent without it is a criminal offence under section 9 of the 1990 Act. It is also an offence to fail to comply with a condition attached to a consent. On conviction, the Act provides for a fine, imprisonment, or both. There is a limited statutory defence for urgent works needed for safety, health or the preservation of the building, but its conditions are strict, including giving the council written notice justifying the work as soon as reasonably practicable.
The council can also serve a listed building enforcement notice requiring the work to be reversed. Unauthorised works can cause problems when you come to sell, because buyers’ solicitors will usually ask whether consent was obtained for alterations.
Listed building consent FAQs
Does listed building consent apply to Grade II buildings?
Yes. The consent requirement applies to all grades. Grade II buildings make up the majority of listed buildings, and the same legal test applies to them.
How do I find out if my building is listed?
You can search the National Heritage List for England, maintained by Historic England. Your council can also confirm whether a property is listed and whether any curtilage structures are likely to be covered.
Get help with listed building consent
A well-prepared application with a clear heritage statement gives your project the best chance of approval and avoids costly delays. Whether your building is in London or elsewhere in the UK, a planning consultant can advise on whether consent is needed, prepare the application and liaise with the conservation officer. Get your planning consultant quote in under 60 seconds and we will put you in touch with an experienced consultant.